| Colour | Black, Orange |
|---|---|
| Length | 15 Meter, 10 Meter, 8 Meter, 5 Meter |
| Clip Type | Frog, Trigger Hook |



War Dog Alpha Long Lead
Price range: R399.00 through R1099.00
The War Dog Alpha Round Leads are made from PVC coated nylon webbing. They are comfortable, easy to clean, does not snag, high visibility leads.
Perfect for everyday use, as well as tracking applications, puppy lines and more.






